Jiach Energy Solutions

Paraffin Melting Tool (PMT)

Well Intervention Tools

SageRider battery-powered downhole paraffin remediation

Paraffin Melting Tool (PMT)
4 Key Features

Well Intervention Tools

Paraffin Melting Tool (PMT)

The SageRider PMT (Paraffin Melting Tool) is a patented, battery-powered tool conveyed on all forms of wireline (slickline, braided line and e-line), using heat plus a cutting system to remove paraffin from the production tubing wall and restore tubing to full drift. The PMT heats its cutting head to more than 450°F, enabling full removal and full-drift production tubing — cutting traditional land paraffin-removal jobs that took 4–8 hours down to around 45 minutes.

Our Reservoir Group alliance also extends to related wellbore-intervention capability: milling and cutting tools (Max-Drill™ motors) for composite frac plugs, seats, cement and scale; wellbore cleaning and debris-removal tools (Tidal Force Tool, venturi junk baskets, washover shoes, hydraulic under-reamers); fishing and retrieval solutions (flow-release slick-catch spears, overshots, cutting/snipping overshots); and INFOCOIL real-time downhole pressure, tension/compression, temperature and CCL data acquisition during intervention.

Applications

Waxy crude production wellsTubing flow-restriction remediation

Key Features

  1. 1Removes tubing wax build-up in place — no full workover required
  2. 2Cutting head heats to over 450°F for full-drift removal
  3. 3Typical job time of ~45 minutes vs. 4–8 hours for traditional methods
  4. 4Wireline or slickline deployable

Enquire

Interested in Paraffin Melting Tool (PMT)?

Talk to our team about availability, specifications and lead times for this product.